Question 56-58
I’m worried about a production rate on assembly line number three. The machine that seals the mobile phone boxes isn’t running as fast as it should, and it’s slowing down the whole process.
Oh, we’ve had trouble with that machine in the past.INstead of having it repaired again, I thing we’d better just replace it.
I agree. But we should try to get a new one put in as soon as possible, or we might have to shut down that assembly line.
OK, I’ll call the company that supplies that equipment.
Yes, see how soon we can get it installed.
I wrote: I’m worried about a production rate on assembly line number 3. The machine not seals the mobile phone boxes isn’t running as faster as it should. And it’s slowing down 4 processes.
Oh, we had a trouble with that machine in the past. In stead of having repaired again, I think it’s better just replace it.
I agree. But we should try to get new one putting as soon as possible. All in my had to shut down assembly line.
OK, I’ll call company that supplies that equipment.
Yes, See her soon we can get it installed.
56 What is the woman concerned about?
- The rate of production
- The availability of staff
- The temperature of a room
- The cost of shipping
57 What do the man suggest?
- Adjusting some controls
- Hiring a technician
- Replacing some equipment
- Using different packaging
58 What does the woman say she will do?
- Checking with a supplier
- Place an advertisement
- Conduct an inspection
- Revise a production shedule
—————————————————————-
availability : 都合、手が空いていること
temperature : 温度
ajust : ~を調整する。
production rate : 製造速度
seal : ~に封をする
run : 動作する
slow down : ~の速度を落とす
whole : 全体の
have trouble with- : ~に問題がある
instead of ~ : ~ではなく
put in ~:~(機械)を取り付ける
shut down ~:~を停止する
install : ~を設置する
2件のコメント